28. 8. 2024

INFORMATION ON NPP TEMELÍN 165 / 2024

The Unit 2 is in the operation. The Unit 1 is disconnected from the grid due to the modification of the so-called axial line of the turbine. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is disconnected from the grid
  • Turbine generator output – 0 MWe
  • Electricity production since the beginning of the year: 4 288 433 MWh

 

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output - 1079 MWe
  • Electricity production since the beginning of the year: 5 727 418 MWh