2. 9. 2024

INFORMATION ON NPP TEMELÍN 168 / 2024

Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is disconnected from the grid
  • Turbine generator output – 1074 MWe
  • Electricity production since the beginning of the year: 4 305 864 MWh

 

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output - 1075 MWe
  • Electricity production since the beginning of the year: 5 855 305 MWh