30. 8. 2006

Information on NPP Temelín 170/2006

Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of ¼ of the reactor fuel.

August 30, 2006

Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of ¼ of the reactor fuel. All auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1 today on August 30, 2006 at 07:00 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 90 %
· Turbine generator output - 907 MWe
· Electricity production since the beginning of the year: 3 775 023 MWh

Information on parameters at Unit 2 today on August 30, 2006 at 07:00 o‘clock:
· Unit is in Mode 6
· Reactor power is 0 %
· Turbine generator output - 0 MWe
· Electricity production since the beginning of the year: 4 609 632 MWh

Milan Nebesář
Spokesman of the Temelín NPP