11. 9. 2006

Information on NPP Temelín 178 / 2006

Unit 1 is in operation on planned power level. At Unit 2, the planned outage is continued that is connected with the yearly replacement of ¼ of the reactor fuel. All auxiliary systems are working in accordance with the operation needs of individual units.

September 11, 2006

In the course of the past weekend, the regular planned test of the reactor control assemblies of Unit 1 has been successfully carried out. Yesterday, shortly before midnight, the turbine generator has been reconnected to the distribution grid. Since this morning, Unit 1 operates at full power and delivers the planned amount of electricity into the national grid of the Czech Republic.

Information on parameters at Unit 1 today on September 11, 2006 at 08:30 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 96 %
· Turbine generator output - 973 MWe
· Electricity production since the beginning of the year: 4 012 415 MWh

Information on parameters at Unit 2 today on September 11, 2006 at 08:30 o‘clock:
· Unit is in Mode 6
· Reactor power is 0 %
· Turbine generator output - 0 MWe
· Electricity production since the beginning of the year: 4 609 632 MWh

Václav Brom Spokesman of the Temelín NPP