Unit 1 is in operation at planned power level. Unit 2 is shut down as planned to perform the replacement of the high pressure turbine rotor.
· Unit is in Mode 1 - power operation
· Reactor power is 95 %
· Turbine generator output - 950 MW
· Electricity production since the beginning of the year: 542 016 MWh Information on parameters at Unit 2 today on January 25, 2006 at 13:15 o‘clock:
· Unit is in Mode 4
· Reactor power is 0%
· Turbine generator output - 0 MW
· Electricity production since the beginning of the year: 54 079 MWh Milan Nebesář