19. 9. 2022

Information on NPP TEMELÍN 182 / 2022

Unit 1 and 2 are in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1096 MWe
  • Electricity production since the beginning of the year: 5 394 279 MWh

 

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output – 1098 MWe
  • Electricity production since the beginning of the year: 5 413 525 MWh