26. 1. 2006
Information on NPP Temelín 19/2006
The first Units is operated at a planned power level. Unit 2 is shutdown as planned for the replacement of the high pressure turbine rotor.
All auxiliary systems are working in accordance with the operation needs of individual units. Information on parameters at Unit 1 today on January 26, 2006 at 08:45 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 95%
· Turbine generator output - 950 MW
· Electricity production since the beginning of the year: 564 823 MWh Information on parameters at Unit 1 today on January 26, 2006 at 08:45 o‘clock:
· Unit is in Mode 5
· Reactor power is 0%
· Turbine generator output - 0 MW
· Electricity production since the beginning of the year: 54 079 MWh Milan Nebesář
Spokesman of the Temelín NPP