Both Unit 1 and 2 are in operation at full rated power. All auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1 today on October 8, 2007 at 9:45 o‘clock:

  • Unit is in Mode 1- power operation
  • Reactor power is 99 %
  • Turbine generator output - 1004 MWe
  • Electricity production since the beginning of the year: 3 188 644 MWh

Information on parameters at Unit 2 today on October 8, 2007 at 9:45 o‘clock:

  • Unit is in Mode 1 - power operation
  • Reactor power is 100 %
  • Turbine generator output – 1006 MWe
  • Electricity production since the beginning of the year: 5 045 354 MWh