16. 10. 2006
Information on NPP Temelín 202/2006
A regular planned test of the reactor control organs has been successfully carried out during the past weekend at Unit 1 and the Unit was synchronized to the distribution grid yesterday in the morning hours.
At Unit 2, the planned outage is continued that is connected with the yearly replacement of 1 of the reactor fuel. All auxiliary systems are working in accordance with the operation needs of individual units. Information on parameters at Unit 1 today on October 16, 2006 at 08:00 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 34 %
· Turbine generator output - 0 MWe
· Electricity production since the beginning of the year: 4 775 729 MWh Information on parameters at Unit 2 today on October 16, 2006 at 08:00 o‘clock:
· Unit is in Mode 6
· Reactor power is 0 %
· Turbine generator output - 0 MWe
· Electricity production since the beginning of the year: 4 609 632 MWh Milan Nebesář
Spokesman of the Temelín NPP