27. 10. 2005
Information on NPP Temelín 209 / 2005
Unit 1 and Unit 2 are in operation at planned power level. All auxiliary systems are working in accordance with the operation modes of individual units.
Milan Nebesář
ČEZ, a.s. Spokesman
Unit 1 and Unit 2 are in operation at planned power level. All auxiliary systems are working in accordance with the operation modes of individual units.