Both Unit 1 and 2 are in operation at full rated power. The auxiliary systems of the power plant are in operation in accordance with the operational needs of the units.

Information on parameters at Unit 1 today on October 25, 2007 at 09:30 o‘clock:

  • Unit is in Mode 1 - power operation
  • Reactor power is 100 %
  • Turbine generator output - 1010 MWe
  • Electricity production since the beginning of the year: 3 598 416 MWh

Information on parameters at Unit 2 today on October 25, 2007 at 09:30 o‘clock:

  • Unit is in Mode 1 - power operation
  • Reactor power is 100 %
  • Turbine generator output - 1011 MW
  • Electricity production since the beginning of the year: 5 453 158 MWh