3. 11. 2008

Information on NPP Temelín 215 / 2008

Unit 2 is in operation at planned power level. Unit 1 is in an outage. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1 today on November 3, 2008 at 9:45 o‘clock:

  • Unit is in Mode 3 
  • Reactor power is 0 %
  • Turbine generator output - 0 MWe
  • Electricity production since the beginning of the year:  4 347 699 MWh

Information on parameters at Unit 2 today on November 3, 2008 at 9:45 o‘clock:

  • Unit is in Mode 1 - power operation
  • Reactor power is 100 %
  • Turbine generator output - 1010 MWe
  • Electricity production since the beginning of the year: 5 975 642 MWh

 

Marek Sviták
Spokesman of the ČEZ Group
Nuclear Power Plant Temelín