07/11/2022
Information on NPP Temelín 215 / 2022
Unit 1 and 2 are in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.
Information on parameters at Unit 1:
- Unit is in the operation
- Turbine generator output – 1097 MWe
- Electricity production since the beginning of the year: 6 682 659 MWh
Information on parameters at Unit 2:
- Unit is in the operation
- Turbine generator output – 1099 MWe
- Electricity production since the beginning of the year: 6 702 128 MWh
News on the topic