Information on NPP Temelín 216 / 2007

Both Unit 1 and 2 are in operation at full rated power. The auxiliary systems of the power plant are in operation in accordance with the operational needs of the units.

Information on parameters at Unit 1 today on November 5, 2007 at 9:30 o‘clock:

  • Unit is in Mode 1 - power operation 
  • Reactor power is 100 %
  • Turbine generator output - 1014 MWe
  • Electricity production since the beginning of the year: 3 866 832 MWh

Information on parameters at Unit 2 today on November 5, 2007 at 9:30 o‘clock:

  • Unit is in Mode 1 - power operation
  • Reactor power is 100 %
  • Turbine generator output - 1012 MW
  • Electricity production since the beginning of the year: 5 721 523 MWh

   