10. 11. 2005
Information on NPP Temelín 219/2005
Unit 1 and Unit 2 are in operation at planned power level. All auxiliary systems are working in accordance with the operation modes of individual units.
· Unit is in Mode 1 - power operation
· Reactor power is 96 %
· Turbine generator output - 980 MW
· Electricity production since the beginning of the year: 4 909 026 MWh Information on parameters at Unit 2 today on November 10, 2005 at 08:15 o’clock:
· Unit is in Mode 1 - power operation
· Reactor power is 75 %
· Turbine generator output - 721 MW
· Electricity production since the beginning of the year: 4 257 349 MWh Milan Nebesář
ČEZ, a.s. Spokesman