7. 2. 2025

INFORMATION ON NPP TEMELÍN 27 / 2025

Both Unit 1 and 2 are in operation. The auxiliary systems are working in accordance with the operational needs of the individual units.

Information on parameters at Unit 1:

  • The power of the reactor – 100 %
  • Electricity production since the beginning of the year: 964 061 MWh

 

Information on parameters at Unit 2:

  • The power of the reactor – 100 %
  • Electricity production since the beginning of the year: 911 353 MWh