Unit 1 and Unit 2 are in operation at planned power level. All auxiliary systems are working in accordance with the operation modes of individual units.
· Unit is in Mode 1 - power operation
· Reactor power is 96 %
· Turbine generator output - 977 MW
· Electricity production since the beginning of the year: 5 003 053 MWh Information on parameters at Unit 2 today on November 14, 2005 at 08:00 o’clock:
· Unit is in Mode 1 - power operation
· Reactor power is 76 %
· Turbine generator output - 723 MW
· Electricity production since the beginning of the year: 4 327 049 MWh Milan Nebesář