18. 11. 2005
Information on NPP Temelín 224 / 2005
Both Unit 1 and 2 are in operation at full rated power. All auxiliary systems are working in accordance with the operation needs of individual units.
· Unit is in Mode 1 - power operation
· Reactor power is 96 %
· Turbine generator output - 979 MW
· Electricity production since the beginning of the year: 5 097 085 MWh Information on parameters at Unit 2 today on November 18, 2005 at 07:30 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 76 %
· Turbine generator output - 725 MW
· Electricity production since the beginning of the year: 4 396 819 MWh Milan Nebesář
ČEZ, a. s., Spokesman