Unit 1 is in operation at planned power. At Unit 2, the operators are currently performing a week lasting series of core physics tests. After its completion, they will synchronize the Unit to the distribution grid.
· Unit is in Mode 1 - power operation
· Reactor power is 96 %
· Turbine generator output - 977 MWe
· Electricity production since the beginning of the year: 5 435 989 MWh Information on parameters at Unit 2 today on November 16, 2006 at 07:30 o‘clock:
· Unit is in Mode 1
· Reactor power is 3 %
· Turbine generator output - 0 MWe
· Electricity production since the beginning of the year: 4 609 632 MWh Milan Nebesář
Spokesman of the Temelín NPP