16. 11. 2006

Information on NPP Temelín 225/2006

Unit 1 is in operation at planned power. At Unit 2, the operators are currently performing a week lasting series of core physics tests. After its completion, they will synchronize the Unit to the distribution grid.

November 16, 2006

All auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1 today on November 16, 2006 at 07:30 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 96 %
· Turbine generator output - 977 MWe
· Electricity production since the beginning of the year: 5 435 989 MWh

Information on parameters at Unit 2 today on November 16, 2006 at 07:30 o‘clock:
· Unit is in Mode 1
· Reactor power is 3 %
· Turbine generator output - 0 MWe
· Electricity production since the beginning of the year: 4 609 632 MWh

Milan Nebesář
Spokesman of the Temelín NPP