22. 11. 2006
Information on NPP Temelín 228/2006
Unit 1 is in operation at planned power. At Unit 2, the core physics tests at 80% rated reactor power are under way.
· Unit is in Mode 1 - power operation
· Reactor power is 96 %
· Turbine generator output - 979 MWe
· Electricity production since the beginning of the year: 5 576 616 MWh Information on parameters at Unit 2 today on November 22, 2006 at 07:30 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 80 %
· Turbine generator output – 789 MWe
· Electricity production since the beginning of the year: 4 627 055 MWh Milan Nebesář
Spokesman of the Temelín NPP