24. 11. 2006
Information on NPP Temelín 229/2006
Unit 1 is in operation at planned power. At Unit 2, the reactor core physics tests at 80% reactor rated power have been completed.
· Unit is in Mode 1 - power operation
· Reactor power is 96 %
· Turbine generator output - 981 MWe
· Electricity production since the beginning of the year: 5 600 088 MWh Information on parameters at Unit 2 today on November 23, 2006 at 09:30 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 88 %
· Turbine generator output – 904 MWe
· Electricity production since the beginning of the year: 4 646 164 MWh Milan Nebesář
Spokesman of the Temelín NPP