1. 2. 2006
Information on NPP Temelín 23 / 2006
Unit 1 is in operation at planned power level. The operations personnel started the Unit 2 reactor and carry on the preparations of all its systems to restore the electricity production. All auxiliary systems are working in accordance with the operation needs of individual units.
· Unit is in Mode 1 - power operation
· Reactor power is 98 %
· Turbine generator output - 980 MW
· Electricity production since the beginning of the year: 705 148 MWh Information on parameters at Unit 2 today on February 1, 2006 at 08:30 o‘clock:
· Unit is in Mode 2
· Reactor power is 0%
· Turbine generator output - 0 MW (at the turning gear with 26 revolutions per minute)
· Electricity production since the beginning of the year: 54 079 MWh Václav Brom NPP Temelín Spokesman