6. 12. 2005
Information on NPP Temelín 236/2005
Unit 1 and Unit 2 are in operation at planned power level. All auxiliary systems are working in accordance with the operation modes of individual units.
· Unit is in Mode 1 - power operation
· Reactor power is 96 %
· Turbine generator output - 981 MW
· Electricity production since the beginning of the year: 5 479 822 MWh Information on parameters at Unit 2 today on December 6, 2005 at 07:30 o’clock:
· Unit is in Mode 1 - power operation
· Reactor power is 87 %
· Turbine generator output – 841 MW
· Electricity production since the beginning of the year: 4 735 070 MWh Milan Nebesář
ČEZ, a.s. Spokesman