5. 12. 2006

Information on NPP Temelín 237 / 2006

Both Unit 1 and 2 are in operation at full rated power. All auxiliary systems are working in accordance with the operation needs of individual units.

December 5, 2006

Information on parameters at Unit 1 today on December 5, 2006 at 10:45 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 96 %
· Turbine generator output - 982 MWe
· Electricity production since the beginning of the year: 5 882 240 MWh

Information on parameters at Unit 2 today on December 5, 2006 at 10:45 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 98 %
· Turbine generator output - 999 MWe
· Electricity production since the beginning of the year: 4 932 585 MWh

Milan Nebesář Spokesman of the Temelín NPP