19/12/2024
INFORMATION ON NPP TEMELÍN 245 / 2024
Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.
Information on parameters at Unit 1:
- Unit is in the operation
- Turbine generator output – 1086 MWe
- Electricity production since the beginning of the year: 7 133 004 MWh
Information on parameters at Unit 2:
- Unit is in the operation
- Turbine generator output - 1095 MWe
- Electricity production since the beginning of the year: 7 191 078 MWh
News on the topic