6. 2. 2006
Information on NPP Temelín 25 / 2006
Unit 1 is in operation at planned power level. Unit 2 operates at half rated power and the planned physics tests are carried on at this power level.
· Unit is in Mode 1 - power operation
· Reactor power is 98 %
· Turbine generator output - 979 MW
· Electricity production since the beginning of the year: 752 150 MWh Information on parameters at Unit 2 today on February 3, 2006 at 08:00 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 50 %
· Turbine generator output - 452 MW
· Electricity production since the beginning of the year: 63 833 MWh Václav Brom NPP Temelín Spokesman