28. 12. 2005
Information on NPP Temelín 250/2005
Unit 1 is shut down to repair the electric magnet in one of the pumps. Unit 2 is in operation at a planned output.
· Unit is in Mode 6
· Reactor power is 0 %
· Turbine generator output - 0 MWe
· Electricity production since the beginning of the year: 5 737 467 MWh Information on parameters at Unit 2 today on December 28, 2005 at 11:45 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 87 %
· Turbine generator output - 830 MW
· Electricity production since the beginning of the year: 5 756 467 MWh Milan Nebesář
ČEZ, a.s. Spokesman