7. 2. 2008

Information on NPP Temelín 27 / 2008

Both Unit 1 and 2 are in operation at full rated power. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1 today on February 7, 2008 at 09:00 o‘clock:

  • Unit is in Mode 1 -  power operation
  • Reactor power is 100 %
  • Turbine generator output - 1015 MWe
  • Electricity production since the beginning of the year: 898 362 MWh

Information on parameters at Unit 2 today on February 7, 2008 at 09:00 o‘clock:

  • Unit is in Mode 1 - power operation 
  • Reactor power is 100 %
  • Turbine generator output - 998 MWe
  • Electricity production since the beginning of the year:  861 799 MWh

 

Marek Sviták
Spokesman of the ČEZ GROUP
Temelín NPP