16. 2. 2007
Information on NPP Temelín 34/2007
Unit 2 is in operation at planned power level. Tonight, Unit 2 will be shut down as planned for a short time. The reason is the performance of the regular test of the reactor control rods.
· Unit is in Mode 6
· Reactor power is 0 %
· Turbine generator output - 0 MWe
· Electricity production since the beginning of the year: 579 239 MWh Information on parameters at Unit 2 today on February 16, 2007 at 07:00 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 99 %
· Turbine generator output - 1010 MW
· Electricity production since the beginning of the year: 1 117 627 MWh Milan Nebesář
Spokesman of the CEZ Group
Temelín NPP