5. 1. 2007
Information on NPP Temelín 4/2007
Both Unit 1 and 2 are in operation at full rated power. Tonight, Unit 1 will be shut down as planned for a short time.
· Unit is in Mode 1 - power operation
· Reactor power is 96 %
· Turbine generator output - 977 MWe
· Electricity production since the beginning of the year: 93 608 MWh Information on parameters at Unit 2 today on January 5, 2007 at 07:00 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 99 %
· Turbine generator output – 1010 MWe
· Electricity production since the beginning of the year: 97 189 MWh Milan Nebesář
Spokesman of the CEZ Group
Temelín NPP