10. 3. 2006
Information on NPP Temelín 50 / 2006
Unit 1 and Unit 2 are in operation at planned power level. All auxiliary systems are working in accordance with the operation modes of individual units.
· Unit is in Mode 1 - power operation
· Reactor power is 97 %
· Turbine generator output - 980 MWe
· Electricity production since the beginning of the year: 1 528 939 MWh Information on parameters at Unit 2 today on March 10, 2006 at 07:00 o’clock:
· Unit is in Mode 1 - power operation
· Reactor power is 97 %
· Turbine generator output - 982 MWe
· Electricity production since the beginning of the year: 881 223 MWh Václav Brom
Spokesman of the Temelín NPP