Information on NPP Temelín 55 / 2008

Both Unit 1 and 2 are in operation at full rated power. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1 today on March 18, 2008 at 8:30 o‘clock:

  • Unit is in Mode 1 -  power operation
  • Reactor power is 100 %
  • Turbine generator output - 1013 MWe
  • Electricity production since the beginning of the year: 1 841 719 MWh

Information on parameters at Unit 2 today on March 18, 2008 at 8:30 o‘clock:

  • Unit is in Mode 1 - power operation 
  • Reactor power is 100 %
  • Turbine generator output - 996 MWe
  • Electricity production since the beginning of the year: 1 787 494 MWh

 

Marek Sviták
Spokesman of the ČEZ GROUP
Temelín NPP