18. 3. 2024

INFORMATION ON NPP TEMELÍN 55 / 2024

The Unit 2 is in the operation. Unit 1 is disconnected from the grid. The reason is the repair of a valve on one of the three technical water systems. In this context, the cooling of the unit takes place. We apologize for any possible noise in the immediate vicinity of the site.The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is disconnected from the grid
  • Turbine generator output – 0 MWe
  • Electricity production since the beginning of the year: 1 996 514 MWh

 

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output - 1088 MWe
  • Electricity production since the beginning of the year: 1 862 680 MWh