28. 3. 2008

Information on NPP Temelín 62 / 2008

Unit 2 is in operation at planned power level. At Unit 1, the few days outage is under way. The auxiliary systems of the power plant are working in accordance with the operation needs.

Information on parameters at Unit 1 today on March 28, 2008 at 08:00 o‘clock:

  • Unit is in Mode 5
  • Reactor power is 0 %
  • Turbine generator output - 0 MWe
  • Electricity production since the beginning of the year: 1 886 508 MWh

Information on parameters at Unit 2 today on March 27, 2008 at 08:00 o‘clock:

  • Unit is in Mode 1 - power operation 
  • Reactor power is 100 %
  • Turbine generator output - 991 MWe
  • Electricity production since the beginning of the year: 2 025 936 MWh

 

Václav Brom
Spokesman of the ČEZ GROUP
Temelín NPP