11. 4. 2007

Information on NPP Temelín 72/2007

Unit 2 is in operation at planned power level. At Unit 1, the operators are currently carrying on the power ascension testing of the reactor at step-by-step increasing power.

April 11, 2007

In the end of the week, the unit will be synchronized to the national distribution grid. All auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1 today on April 11, 2007 at 07:30 o‘clock:
· Unit is in Mode 1
· Reactor power is 28 %
· Turbine generator output - 0 MWe
· Electricity production since the beginning of the year: 579 239 MWh

Information on parameters at Unit 2 today on April 11, 2007 at 07:30 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 99 %
· Turbine generator output - 1007 MW
· Electricity production since the beginning of the year: 2 395 664 MWh

Milan Nebesář
Spokesman of the CEZ Group
Temelín NPP