11. 4. 2007
Information on NPP Temelín 72/2007
Unit 2 is in operation at planned power level. At Unit 1, the operators are currently carrying on the power ascension testing of the reactor at step-by-step increasing power.
· Unit is in Mode 1
· Reactor power is 28 %
· Turbine generator output - 0 MWe
· Electricity production since the beginning of the year: 579 239 MWh Information on parameters at Unit 2 today on April 11, 2007 at 07:30 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 99 %
· Turbine generator output - 1007 MW
· Electricity production since the beginning of the year: 2 395 664 MWh Milan Nebesář
Spokesman of the CEZ Group
Temelín NPP