20. 4. 2007

Information on NPP Temelín 80 / 2007

Unit 2 is in operation at planned power level. At Unit 1, the operators brought the reactor into operation at 5:46 a.m. After the reactor power increase, the Unit will be synchronized to the grid tonight. All auxiliary systems are working in accordance with the operation needs of individual units.

April 20, 2007

Information on parameters at Unit 1 today on April 20, 2007 at 09:00 o‘clock:
· Unit is in Mode 2
· Reactor power is 1 %
· Turbine generator output - 0 MWe
· Electricity production since the beginning of the year: 579 239 MWh

Information on parameters at Unit 2 today on April 20, 2007 at 09:00 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 100 %
· Turbine generator output - 1009 MW
· Electricity production since the beginning of the year: 2 614 339 MWh

Václav Brom
Spokesman of the CEZ Group Temelín NPP