26. 4. 2006
Information on NPP Temelín 82/2006
Both Unit 1 and 2 are in operation at full rated power. All auxiliary systems are working in accordance with the operation needs of individual units.
· Unit is in Mode 1 - power operation
· Reactor power is 93 %
· Turbine generator output - 930 MW
· Electricity production since the beginning of the year: 2 606 261 MWh Information on parameters at Unit 2 today on April 26, 2006 at 07:15 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 96 %
· Turbine generator output - 979 MW
· Electricity production since the beginning of the year: 1 988 008 MWh Milan Nebesář
Spokesman of the Temelín NPP