26. 4. 2007
Information on NPP Temelín 84 / 2007
Unit 2 is in operation at planned power level. At Unit 1, the circulation water pump repair has been completes yesterday in the afternoon and the unit has been synchronized to the power distribution grid.
· Unit is in Mode 3
· Reactor power is 0 %
· Turbine generator output - 0 MWe
· Electricity production since the beginning of the year: 671 996 MWh Information on parameters at Unit 2 today on April 26, 2007 at 08:30 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 100 %
· Turbine generator output - 1010 MW
· Electricity production since the beginning of the year: 2 760 145 MWh Václav Brom
Spokesman of the CEZ Group Temelín NPP