4. 5. 2006

Information on NPP Temelín 87 / 2006

Both Unit 1 and 2 are in operation at full rated power. All auxiliary systems are working in accordance with the operation needs of individual units.

May 4, 2006

Information on parameters at Unit 1 today on May 4, 2006 at 9:30 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 96 %
· Turbine generator output - 980 MW
· Electricity production since the beginning of the year: 2 790 190 MWh

Information on parameters at Unit 2 today on May 4, 2006 at 9:30 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 97 %
· Turbine generator output - 981 MW
· Electricity production since the beginning of the year: 2 150 345 MWh

Václav Brom Spokesman of the Temelín NPP