2. 5. 2007

Information on NPP Temelín 87 / 2007

Both Unit 1 and 2 are in operation at full rated power. All auxiliary systems of the power plant are in operation in accordance with the operational needs of the units.

May 2, 2007

Information on parameters at Unit 1 today on May 2, 2007 at 8:15 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 97 %
· Turbine generator output - 980 MWe
· Electricity production since the beginning of the year: 789 972 MWh

Information on parameters at Unit 2 today on May 2, 2007 at 8:15 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 99 %
· Turbine generator output - 1010 MW
· Electricity production since the beginning of the year: 2 905 926 MWh

Ing. Marek Sviták
Spokesman of the CEZ Group Temelín NPP