Nuclear Power Plant news pg. 179
INFORMATION ON NPP DUKOVANY 28/7/2022
Units 1, 2, 3 are in the operation. The Unit 4 is in a startup mode after refuelling. Electricity production since the beginning of the operation: 485 162 477 MWh.
28. 7. 2022
INFORMATION ON NPP DUKOVANY 27/7/2022
Units 1, 2, 3 are in the operation. Unit 4 is in the planned outage for refuelling. Electricity production since the beginning of the operation: 485 127 780 MWh.