Nuclear Power Plant news pg. 184
INFORMATION ON NPP DUKOVANY 7/7/2022
Units 1, 2, 3 are in the operation. Unit 4 is in the planned outage for refuelling. Electricity production since the beginning of the operation: 484 434 729 MWh.
7. 7. 2022
INFORMATION ON NPP DUKOVANY 4/7/2022
Units 1, 2, 3 are in the operation. Unit 4 is in the planned outage for refuelling. Electricity production since the beginning of the operation: 484 330 434 MWh.