Nuclear Power Plant news pg. 36
Information on NPP DUKOVANY 5/12/2023
Units 1, 2, 3 are in the operation. Unit 4 is in the planned outage for refuelling. Electricity production since the beginning of the operation: 505 173 198 MWh.
5. 12. 2023
Information on NPP DUKOVANY 4/12/2023
Units 1, 2, 3 are in the operation. Unit 4 is in the planned outage for refuelling. Electricity production since the beginning of the operation: 505 137 184 MWh.