Nuclear Power Plant news pg. 76
INFORMATION ON NPP TEMELÍN 68 / 2023
The Unit 1 is in the operation in so-called power effect operation. During it, the operators will gradually reduce the power of the reactor by almost one percent a day. The operation on the power effect will finished on Friday April 7, by a planned shutdown for refueling. The Unit 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.
5. 4. 2023
INFORMATION ON NPP TEMELÍN 67 / 2023
Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.