Nuclear Power Plant news pg. 1048

JE Temelin traffic

Information on NPP Temelín 159 / 2008

Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.

14. 8. 2008

JE Temelin traffic

Information on NPP Temelín 158 / 2008

Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.

13. 8. 2008

JE Temelin traffic

Information on NPP Temelín 157 / 2008

Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.

12. 8. 2008

JE Temelin traffic

Information on NPP Temelín 156 / 2008

Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.

11. 8. 2008