Nuclear Power Plant news pg. 1059

JE Temelin traffic

Information on NPP Temelín 112 / 2008

Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.

10. 6. 2008

JE Temelin traffic

Information on NPP Temelín 111 / 2008

Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.

9. 6. 2008

JE Temelin traffic

Information on NPP Temelín 110 / 2008

Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.

6. 6. 2008

JE Temelin traffic

Information on NPP Temelín 109 / 2008

Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.

5. 6. 2008