Nuclear Power Plant news pg. 1069
Information on NPP Temelín 69 / 2008
Unit 2 is in operation at planned power level. At Unit 1, the planned outage is under way. The auxiliary systems of the power plant are working in accordance with the operation needs.
8. 4. 2008
Information on NPP Temelín 68 / 2008
Unit 2 is in operation at planned power level. At Unit 1, the planned outage is under way. The auxiliary systems of the power plant are working in accordance with the operation needs.