Nuclear Power Plant news pg. 1134
Information on NPP Temelín 42/2007
Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of ¼ of the reactor fuel.
28. 2. 2007
Information on NPP Temelín 41/2007
Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of ¼ of the reactor fuel.