Nuclear Power Plant news pg. 1170

JE Temelin traffic

Information on NPP Temelín 135/2006

At Unit 2, the repair of the generator breaker air control system is under way. At Unit 1, the planned outage connected with the annual replacement of ¼ of fuel in the reactor is under way.

13. 7. 2006

JE Temelin traffic

Information on NPP Temelín 134/2006

At Unit 2, the repair of the generator breaker air control system is under way. At Unit 1, the planned outage connected with the annual replacement of ¼ of fuel in the reactor is under way.

12. 7. 2006

JE Temelin traffic

Information on NPP Temelín 133/2006

At Unit 2, the repair on the control air system of the generator breaker is under way. At Unit 1, the planned outage connected with the annual replacement of ¼ of fuel in the reactor is under way.

11. 7. 2006

JE Temelin traffic

Information on NPP Temelín 132/2006

After the Saturday?s successful test of the reactor control equipment, the operators found a leakage in the control air system of the generator breaker at Unit 2 during the power escalation.