Nuclear Power Plant news pg. 22

JE Temelin traffic

INFORMATION ON NPP TEMELÍN 245 / 2019

Both Unit 1 and 2 are in operation. On Friday evening the power plant decreased its output by 50 percent. The second unit remained on the full power operation, the first unit was disconnected from the grid. Parallel with the work of ČEPS, the plant´s technicians verified the turbine settings. The operation personnel connected the first unit to the grid on Sunday night. Currently, the second unit is at full power level, the first unit at 60 percent. Full power level is planned still today. The auxiliary systems are working in accordance with the operation needs of individual units.

23. 12. 2019

JE Temelin traffic

INFORMATION ON NPP TEMELÍN 244 / 2019

Both Unit 1 and 2 are in operation. The auxiliary systems are working in accordance with the operation needs of individual units.

20. 12. 2019

JE Temelin traffic

INFORMATION ON NPP TEMELÍN 243 / 2019

Both Unit 1 and 2 are in operation. The auxiliary systems are working in accordance with the operation needs of individual units.

19. 12. 2019

JE Temelin traffic

INFORMATION ON NPP TEMELÍN 242 / 2019

Both Unit 1 and 2 are in operation. The auxiliary systems are working in accordance with the operation needs of individual units.

18. 12. 2019